Project Portfolio
2026
House Envelope Repairs - Possession Road
Investigation of water intrusion at roof and siding
Budget creation, programming, bid analysis
Owner’s Representation for repair work
Land Development Feasibility Study - Bailey Road
Market Analysis for Costs and ROI of Land-up development
Cost Estimation of utilities, on-site construction, and modular buildings
House Lift- Barr Beach Road
Cost Estimation of lifting an existing house above FEMA flood plain
Workplan creation and solicitation of trade partner proposals
RFIs and Designer coordination
2024-2026
King Water District Tenant Improvement- King Water District (Valdez Construction)
Extensive TI renovation to convert a lumber store to a corporate office for a utility management company
Compressed construction schedule due to funding requirements
New framing, finishes, and MEP modifications
Camano Health Clinic Water Damage Restoration- Island County (Valdez Construction)
Repairs to water-damaged rural medical facility
Plumbing modifications and new finishes throughout
Work performed in an operating clinic
City Hall Renovation- City of Everson (Valdez Construction)
Seismic Retrofit and interior improvements of an existing concrete structure with wood-frame barrel roof
City Hall building occupied during construction
Complications due to structural anomalies of a 92- year-old building
Lopez Village North Phase 1 – Housing Lopez (Valdez Construction)
https://housinglopez.org/village-north/
$3M Construction Value
15 Units of affordable housing in Lopez Village
Extensive site work and utility construction in Right-of way
8 Modular Buildings placed by crane on site-built foundations
Remote site location during winter months and ferry schedule
WA State Department of Commerce Funding
Bus Barn Improvements- Oak Harbor School District (Valdez Construction)
Structural retrofits to an aging bus barn facility
Retrofit and Facilities Improvement - Alderwood Water and Wastewater District (Valdez Construction)
$5 Million Construction Value
Work on 5 existing buildings in the AWWD campus
Seismic retrofitting of concrete tilt-up construction
New office and maintenance bays
Re-roof of 5 separate buildings with TPO and metal roof overlays
2019-2024
Completed 12 new custom residential structures and 7 remodels on Whidbey Island;
Typical Construction Value $1.5 – $3.5M
Roads, Utilities, and Pre-Construction Site Work
Steep Slopes, Wetland Adjacent, and other Critical Areas considerations
House-raising in FEMA Flood Zones
Concrete Foundations with Wood and Structural Steel Framing
Custom interior finishes including high-end cabinetry
Constructed features included;
Sound-attenuated recording studio
sunrooms, decks
theater room,
whiskey cave, art studio
outdoor pool
outdoor kitchen
pole barns
2018-2019
Lifebridge Market Rate East and West - 11725 NE 118th St Kirkland WA (Katerra Inc)
Construction value $100M
409 apartment units
Concrete Podium with mass timber and pre-manufactured modular framing
Concrete Parking garage
Lifebridge Senior Housing - 11725 NE 118th St Kirkland WA (Katerra Inc)
Construction Value $40M
153 units of affordable housing reserved for seniors
Extensive lighting design elements
Custom landscaping and pedestrian bridge
The Postmark Apartments - 17233 15th Ave NE Shoreline WA 98034 (Katerra Inc)
Construction Value $55M
243-unit apartment buildings
5 wood-framed stories over post-tensioned concrete podium
Extensive mass timber and cross-laminated timber (CLT) construction
Custom structural steel brackets for CLT connections
2018
Pacific Highway South HOV Widening Phase 5 - City of Federal Way (KPG Inc)
$9M project value
Soldier Pile Retaining Walls
Traffic signal modifications at 5 intersections
New ductile iron watermain and connections to asbestos concrete
Stormwater facilities, treatment vaults, detention ponds
1.5 miles of Joint Utility Trench- electrical, telecom, traffic signal
2017
S 352nd St Extension - City of Federal Way (KPG Inc)
New road construction; concrete and asphalt construction
Modular block wall retaining systems
Street illumination
Landscaping and decorative streetscape pedestrian paths
2016
S 144th St Improvements-Phase 2 for the City of Tukwila (KPG Inc)
Safe Routes to School streetscape improvement
Raised decorative concrete road crossings with signals
2015
136th Ave E Roadbuilding – City of Sumner (KPG Inc)
Pre-loading material for roadway compaction in bad soils
Extensive concrete paving in an industrial corridor
2014
East Marginal Way Improvements- City of Tukwila (KPG Inc)
Award-winning asphalt paving on a busy corridor adjacent Boeing and KC Airport