Project Portfolio

2026

House Envelope Repairs - Possession Road

  • Investigation of water intrusion at roof and siding

  • Budget creation, programming, bid analysis

  • Owner’s Representation for repair work

Land Development Feasibility Study - Bailey Road

  • Market Analysis for Costs and ROI of Land-up development

  • Cost Estimation of utilities, on-site construction, and modular buildings

House Lift- Barr Beach Road

  • Cost Estimation of lifting an existing house above FEMA flood plain

  • Workplan creation and solicitation of trade partner proposals

  • RFIs and Designer coordination

2024-2026

King Water District Tenant Improvement- King Water District (Valdez Construction)

  • Extensive TI renovation to convert a lumber store to a corporate office for a utility management company

  • Compressed construction schedule due to funding requirements

  • New framing, finishes, and MEP modifications

Camano Health Clinic Water Damage Restoration- Island County (Valdez Construction)

  • Repairs to water-damaged rural medical facility

  • Plumbing modifications and new finishes throughout

  • Work performed in an operating clinic

City Hall Renovation- City of Everson (Valdez Construction)

  • Seismic Retrofit and interior improvements of an existing concrete structure with wood-frame barrel roof

  • City Hall building occupied during construction

  • Complications due to structural anomalies of a 92- year-old building

Lopez Village North Phase 1 – Housing Lopez (Valdez Construction)

https://housinglopez.org/village-north/

  • $3M Construction Value

  • 15 Units of affordable housing in Lopez Village

  • Extensive site work and utility construction in Right-of way

  • 8 Modular Buildings placed by crane on site-built foundations

  • Remote site location during winter months and ferry schedule

  • WA State Department of Commerce Funding

Bus Barn Improvements- Oak Harbor School District (Valdez Construction)

  • Structural retrofits to an aging bus barn facility

Retrofit and Facilities Improvement - Alderwood Water and Wastewater District (Valdez Construction)

  • $5 Million Construction Value

  • Work on 5 existing buildings in the AWWD campus

  • Seismic retrofitting of concrete tilt-up construction

  • New office and maintenance bays

  • Re-roof of 5 separate buildings with TPO and metal roof overlays

2019-2024

Completed 12 new custom residential structures and 7 remodels on Whidbey Island;

  • Typical Construction Value $1.5 – $3.5M

  • Roads, Utilities, and Pre-Construction Site Work

  • Steep Slopes, Wetland Adjacent, and other Critical Areas considerations

  • House-raising in FEMA Flood Zones

  • Concrete Foundations with Wood and Structural Steel Framing

  • Custom interior finishes including high-end cabinetry

  • Constructed features included;

    • Sound-attenuated recording studio

    • sunrooms, decks

    • theater room,

    • whiskey cave, art studio

    • outdoor pool

    • outdoor kitchen

    • pole barns

2018-2019

Lifebridge Market Rate East and West - 11725 NE 118th St Kirkland WA (Katerra Inc)

  • Construction value $100M

  • 409 apartment units

  • Concrete Podium with mass timber and pre-manufactured modular framing

  • Concrete Parking garage

Lifebridge Senior Housing - 11725 NE 118th St Kirkland WA (Katerra Inc)

  • Construction Value $40M

  • 153 units of affordable housing reserved for seniors

  • Extensive lighting design elements

  • Custom landscaping and pedestrian bridge

 The Postmark Apartments - 17233 15th Ave NE Shoreline WA 98034 (Katerra Inc)

  • Construction Value $55M

  • 243-unit apartment buildings

  • 5 wood-framed stories over post-tensioned concrete podium

  • Extensive mass timber and cross-laminated timber (CLT) construction

  • Custom structural steel brackets for CLT connections

2018

Pacific Highway South HOV Widening Phase 5 - City of Federal Way (KPG Inc)

  • $9M project value

  • Soldier Pile Retaining Walls

  • Traffic signal modifications at 5 intersections

  • New ductile iron watermain and connections to asbestos concrete

  • Stormwater facilities, treatment vaults, detention ponds

  • 1.5 miles of Joint Utility Trench- electrical, telecom, traffic signal

2017

S 352nd St Extension - City of Federal Way (KPG Inc)

  • New road construction; concrete and asphalt construction

  • Modular block wall retaining systems

  • Street illumination

  • Landscaping and decorative streetscape pedestrian paths

2016

S 144th St Improvements-Phase 2 for the City of Tukwila (KPG Inc)

  •   Safe Routes to School streetscape improvement

  •   Raised decorative concrete road crossings with signals

2015

136th Ave E Roadbuilding – City of Sumner (KPG Inc)

  • Pre-loading material for roadway compaction in bad soils

  • Extensive concrete paving in an industrial corridor

2014

East Marginal Way Improvements- City of Tukwila (KPG Inc)

  • Award-winning asphalt paving on a busy corridor adjacent Boeing and KC Airport